Very busy first three months of 2022 at East Rockingham Waste to Energy. This flyover shows the construction of the bottom ash building. A hugely important part of the project, the IBA Plant will recover 20% of materials from the red top bin left behind after combustion. The plant will produce two sizes of recycled aggregates and recover ferrous and non-ferrous metals. The project is on track to receive first waste before the end of 2022.